2023 BMW M3 Competition xDrive
- VIN: WBS43AY06PFR42718
- Stock: PFR42718
Basic Info
-
Exterior:Individual Dravit Grey Metallic
-
Drivetrain:All Wheel Drive
-
Interior:Fiona Red/Black
-
Transmission:A/T
-
Engine:3.0L STRA 6 CYL
-
Fuel Type:Gasoline Fuel
-
Fuel Efficiency:16 CITY / 22 HWY
-
Mileage:15,100
History Report
View Your Free ReportKey Features
-
AWD
-
Cooled Seats
-
Leather Seats
-
Navigation System
-
Parking Sensors / Assist
Description
- M Carbon Exterior Package
- Individual Dravit Grey Metallic
- Executive Package
- Driving Assistance Professional Package
- Icon Adaptive Led Headlights W/Laserlight
- Carbon Fiber Trim
- Parking Assistance Package
- Leather Seats
- Navigation System
- Front Ventilated Seats
- M Shadowline Lights
- Wireless Device Charging
- Drive Recorder
- Lane Keeping Assist
- Keyless Start
- Rear Spoiler
- Heads-Up Display
- Cooled Front Seat(S)
- Fiona Red/Black; Extended Merino Leather Upholstery (Va)
- M Compound Brakes W/Red Calipers
- M Sport Seats
- Wheels: 19"X9.5" Fr. & 20"X10.5" Rr M Black
This vehicle includes a Money-Back Guarantee* and passed our precise inspection process. Best of all the price you see is the price you pay. No haggling. No back and forth. No pressure. And this price is so good it is guaranteed. *Money-Back Guarantee is valid for 5 days or 250 miles, whichever comes first. Subject to certain terms and conditions. See store for details. Some restrictions apply.
2023BMWM3 Today's luxury vehicle is not just about opulence. It's about a perfect balance of performance, comfort and attention to detail. This 2023 BMW M3 Competition xDrive is the perfect example of the modern luxury. This BMW M3 Competition xDrive comes equipped with all wheel drive, which means no limitations as to how or where you can drive. Different terrains and varying weather conditions will have little effect as to how this vehicle performs. In addition to being well-cared for, this BMW M3 has very low mileage making it a rare find. This vehicle won't last long, take it home today.
Vehicle Details
Details
- Leather Seats
- Navigation System
- Lane Keeping Assist
- Front Ventilated Seats
- Wireless Device Charging
- Drive Recorder
- Carbon Fiber Trim
- Icon Adaptive Led Headlights W/Laserlight
- M Shadowline Lights
- Keyless Start
- M Carbon Exterior Package Priority 1
- M Compound Brakes W/Red Calipers
- Executive Package -Inc: Remote Engine Start
- Power Tailgate
- Sensatec Dashboard
- Bmw Head Up Display
- Heated Steering Wheel
- Executive Package -Inc: Remote Engine Start
- Power Tailgate
- Bmw Head Up Display
- Heated Steering Wheel (Disc) No Longer Available For Factory Ordering As Of June 17
- 2022. *No Longer Factory Orderable
- See Dealer For Current Availability*
- Rear Spoiler
- Parking Assistance Package -Inc: Parking Assistant Plus
- Driving Assistance Professional Package -Inc: Active Driving Assistant Pro
- Extended Traffic Jam Assistant
- For Limited Access Highways
- Heads-Up Display
- Fiona Red/Black
- Extended Merino Leather Upholstery (Va)
- M Sport Seats (Std)
- Cooled Front Seat(S)
- Individual Dravit Grey Metallic
- Wheels: 19"X9.5" Fr. & 20"X10.5" Rr M Black -Inc: Style 826M
- Double-Spoke
Customer Reviews
Get Directions
Please enter an address
to 5700 Okeechobee Boulevard - West Palm Beach, FL 33417
Disclaimer:
Accessories and color may vary. Quoted price subject to change without notice to correct errors or omissions. New vehicle pricing may already include applicable manufacturer incentives which may expire at any time. Manufacturer incentive data and vehicle features is provided by third parties and believed to be accurate as of the time of publication. Please contact the store by email or phone for details and availability of incentives. Sales tax or other taxes, tag, title, registration fees, and government fees are not included in quoted price. $499 Electronic filing fee and $995 dealer service fee are included in quoted price.
Certain data and other content displayed herein is copyrighted by AutoNation, Inc. and / or third parties. (In addition, providers of data and other materials to AutoNation, Inc. or such third parties may have a copyright interest in and to such data to the extent that such data and other materials are subject to copyright protection under applicable United States laws.) Such data may not be reproduced or distributed in whole or in part by any printed, electronic or other means without explicit written permission from AutoNation, Inc. All information is gathered from sources that are believed to be reliable, but no assurance can be given that this information is complete and neither AutoNation, Inc. nor its suppliers assume any responsibility for errors or omissions or warrant the accuracy of this information.
Displayed MPG is based on applicable EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary, depending on how you drive and maintain your vehicle, driving conditions, battery pack age/condition (hybrid models only) and other factors.
**Sticker reflects features and subscriptions available at time of original vehicle purchase. See your Lexus dealer for updated information.
Displayed MPG is based on applicable EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary, depending on how you drive and maintain your vehicle, driving conditions, battery pack age/condition (hybrid models only) and other factors.
While great effort is made to ensure the accuracy of the information on this site, errors do occur so please verify information with a customer service rep. This is easily done by calling us at 855-799-3510 or by visiting us at the dealership.
**Sticker reflects features and subscriptions available at time of original vehicle purchase. See your Lexus dealer for updated information.

